PROJECT OVERVIEW
Pavilion AD plant– High Level Inputs and Outputs
Pavilion plans to process 19,700 tonnes of Chicken Litter from its own Anakie chicken farms and 10,000 tonnes of food and agricultural waste through its OFBF plant. The key inputs and outputs are highlighted below.
OFBF Plant Inputs (annual)
- 19,700+ tonnes of Chicken Litter
- 10,000 tonnes of carbon rich agricultural and food waste which would otherwise go to landfill eg Cattle paunch, fruit and vegetable waste, cheese whey or a combination of all
- 157,500 cubic metres of recyclable water (80%+ recycled back through AD process)
OFBF Plant Outputs (annual)
- 5,000,000+m3 of methane, convertible to 21,000Mw of renewable power per annum
- Equivalent amount of heat with multi use applications to be investigated
- 6,000+ tonnes of dry, nutrient rich, concentrated organic fertiliser with high NPK
- 3,100,000 +m3 of CO2 capable of being upgraded to food grade quality
- Potential CO2e offsets of 30,000+ tonnes per annum
- Significant local jobs
Project Timing and anticipated roll out
Key milestone dates are summarised below:
- Project Development Phase including planning and design (Current – September 2022)
- Project Funding (September 2022)
- EPA Development License (October 2022)
- Planning Permit (October 2022)
- Preliminary Works (October 2022)
- Main Construction and Installation Phase (November 2022 - September 2023)
- Testing, commissioning and connection to Grid (September 2023)
- Knowledge Sharing (ongoing)
Project Visuals